TABLES FROM PAGE 4 and 1
Table 1
Mechanical Frosting System-756 g/s (6000 lb/h)
|
|
|
1970
|
1980
|
1980
|
| Mechanical System Installed |
$235,000
|
$510,000
|
$560,000
|
| Electrical Energy Costs |
1 cent/kWh
|
5 cent/kWh
|
5 cent/kWh
|
| Cost for 4000 Hours Operation |
$19,460
|
$97,304
|
$82,700
|
| Operating Cost as % of Investment |
8.3%
|
19%
|
14.8%
|
|
| (1) With additional Investment for energy savings |
|
Table 1
Mechanical Frosting System-756 g/s (6000 lb/h)
|
|
KW/100 kJ
|
KW/100 Btu
|
| Liquid N2 |
0.404
|
0.383
|
| Liquid C02 |
0.106
|
0.100
|
| Mechanical |
0.023
|
0.022
|
|
|
|
Home Page | Advanced Equipment Inc. Richmond, BC | ph:604-276-8989 | fax:604-276-8962 | Contact Us |
|